Traction substation control system

Automation and IT infrastructure for six traction substations of the Kazakh railway

Traction substation control system
КТЖ
Проект завершен: 08.09.2015
Implementation of part of the Siemens project for the construction of seven new traction substations on the Astana – Shu section.

In particular, the introduction of a power metering automation system, the introduction of a video surveillance system, the installation and commissioning of security and fire alarms.

Connection of installed systems to remote dispatching consoles of JSC “KTZh”.